重要客户运作系统介绍--DELL.ppt14
重要客户运作系统介绍--DELL.ppt14内容简介
Dell工程變更通知要求
Any supplier changes to form, fit, function, or appearance
任何影響外形結構,安裝,功能,或外觀的變更須通知
OEM must be notified in writing OEM須被書面通知到
Required number of days notice should be defined in the QPM/MQT 應定義所需的通知天數
OEM SQE should be the conduit for any supplier changes - not OEM manufacturing or engineering
任何供應商變更應通過OEM SQE管道(非OEM制程或工程)
OEM SQE works with Supplier to ensure OEM is notified of supplier changes
OEM SQE應該對供應商的變更作掌控並確保OEM被通知到
..............................
Any supplier changes to form, fit, function, or appearance
任何影響外形結構,安裝,功能,或外觀的變更須通知
OEM must be notified in writing OEM須被書面通知到
Required number of days notice should be defined in the QPM/MQT 應定義所需的通知天數
OEM SQE should be the conduit for any supplier changes - not OEM manufacturing or engineering
任何供應商變更應通過OEM SQE管道(非OEM制程或工程)
OEM SQE works with Supplier to ensure OEM is notified of supplier changes
OEM SQE應該對供應商的變更作掌控並確保OEM被通知到
..............................
上一篇:直营客户-市场拜访.ppt16
下一篇:主动推进的客户服务.ppt34
用户登陆
客户管理热门资料
客户管理相关下载