某供应商手册英文(pdf 63页)
- 所属分类:
- 企业管理手册
- 文件大小:
- 1027 KB
- 下载地址:
- 相关资料:
- 供应商手册
某供应商手册英文(pdf 63页)内容简介
Table of Contents
1 Introduction...............................................................3
1.1 Abstract..............................................................3
1.2 Application............................................................3
1.3 Purpose..............................................................3
1.4 Reading suggestions.....................................................3
2 Ericsson Procured Material Quality Assurance.....................................4
2.1 The Procured Material Quality Assurance Organisation..........................4
2.2 The PMQA Organisation within Research and Development......................4
2.3 The roles at Ericsson regarding the requirements on a component...................5
2.4 The Ericsson Supplier Academy............................................6
2.5 Supplier Improvement Program (SIP)........................................6
3 Ericsson Quality Targets.....................................................7
3.1 PPM levels............................................................7
3.2 Yield levels...........................................................7
3.3 Capability levels........................................................8
4 Supplier Quality Assurance Plan (SQAP)........................................9
4.1 Purpose..............................................................9
4.2 Level and amount of work required..........................................9
4.3 Quality Requirements Planning............................................11
4.4 SQAP Requirements....................................................12
4.5 Execution and submission of the individual steps in the SQAP....................13
5 PMQA and supplier processes in a typical high-volume project.......................14
5.1 Milestone 1...........................................................14
5.2 Milestone 2...........................................................15
5.3 Milestone 3...........................................................16
5.4 Milestone 4...........................................................17
5.5 Milestone 5...........................................................18
5.6 Milestone 6...........................................................19
5.7 Milestone 7...........................................................20
5.8 After milestone 7......................................................21
6 The 10 steps in the SQAP...................................................22
6.1 Design Producibility Review (DPR)........................................22
6.2 Process Failure Mode and Effect Analysis (Process FMEA)......................24
6.3 Design of Experiments..................................................26
6.4 SPC and Inspection Plan.................................................29
6.5 Preparation for the Serial Process Verification Run (Preparation SPVR).............32
6.6 Quality Plan for Sub-suppliers............................................36
6.7 Gauge Repeatability and Reproducibility....................................38
6.8 Capability Studies......................................................42
6.9 Process Sample Approval (PSA)...........................................44
6.9.1 Dimensional check of Process Samples..................................45
6.9.2 Functionality and Reliability of Process Samples...........................46
6.9.3 Cosmetics of Process Samples.........................................47
6.10 Serial Process Verification Run (SPVR).....................................48
6.10.1 The process capability study..........................................49
6.10.2 The capacity verification.............................................52
7 SPVR results and actions....................................................57
7.1 General requirements...................................................57
7.2 Possible scenarios and recommended actions.................................58
7.2.1 State of Chaos.....................................................58
7.2.2 Brink of Chaos....................................................59
7.2.3 Threshold State....................................................59
7.2.4 Ideal State........................................................60
8 Abbreviations and Glossary..................................................61
..............................
1 Introduction...............................................................3
1.1 Abstract..............................................................3
1.2 Application............................................................3
1.3 Purpose..............................................................3
1.4 Reading suggestions.....................................................3
2 Ericsson Procured Material Quality Assurance.....................................4
2.1 The Procured Material Quality Assurance Organisation..........................4
2.2 The PMQA Organisation within Research and Development......................4
2.3 The roles at Ericsson regarding the requirements on a component...................5
2.4 The Ericsson Supplier Academy............................................6
2.5 Supplier Improvement Program (SIP)........................................6
3 Ericsson Quality Targets.....................................................7
3.1 PPM levels............................................................7
3.2 Yield levels...........................................................7
3.3 Capability levels........................................................8
4 Supplier Quality Assurance Plan (SQAP)........................................9
4.1 Purpose..............................................................9
4.2 Level and amount of work required..........................................9
4.3 Quality Requirements Planning............................................11
4.4 SQAP Requirements....................................................12
4.5 Execution and submission of the individual steps in the SQAP....................13
5 PMQA and supplier processes in a typical high-volume project.......................14
5.1 Milestone 1...........................................................14
5.2 Milestone 2...........................................................15
5.3 Milestone 3...........................................................16
5.4 Milestone 4...........................................................17
5.5 Milestone 5...........................................................18
5.6 Milestone 6...........................................................19
5.7 Milestone 7...........................................................20
5.8 After milestone 7......................................................21
6 The 10 steps in the SQAP...................................................22
6.1 Design Producibility Review (DPR)........................................22
6.2 Process Failure Mode and Effect Analysis (Process FMEA)......................24
6.3 Design of Experiments..................................................26
6.4 SPC and Inspection Plan.................................................29
6.5 Preparation for the Serial Process Verification Run (Preparation SPVR).............32
6.6 Quality Plan for Sub-suppliers............................................36
6.7 Gauge Repeatability and Reproducibility....................................38
6.8 Capability Studies......................................................42
6.9 Process Sample Approval (PSA)...........................................44
6.9.1 Dimensional check of Process Samples..................................45
6.9.2 Functionality and Reliability of Process Samples...........................46
6.9.3 Cosmetics of Process Samples.........................................47
6.10 Serial Process Verification Run (SPVR).....................................48
6.10.1 The process capability study..........................................49
6.10.2 The capacity verification.............................................52
7 SPVR results and actions....................................................57
7.1 General requirements...................................................57
7.2 Possible scenarios and recommended actions.................................58
7.2.1 State of Chaos.....................................................58
7.2.2 Brink of Chaos....................................................59
7.2.3 Threshold State....................................................59
7.2.4 Ideal State........................................................60
8 Abbreviations and Glossary..................................................61
..............................
上一篇:供应商操作手册(doc 17页)
下一篇:某物业住户手册(doc 33页)
用户登陆
企业管理手册热门资料
企业管理手册相关下载