工业产品采购合同样本(doc 8页)内容简介
工业产品采购合同样本内容提要:
交货周期: 
1.Purchase contract signed and down payment received
采购合同签署,以及付款条件实现和遵守
2.Correct part’s drawing and customer specification
合格的产品图纸和买方技术要求
3.Correct and enough sample parts
合格且足够的样品样件
4.Buyer must provide written confirmation for design approval, pre-acceptance, finial acceptance; When process delay is caused by the buyer, the delay will not be calculated into delivery time.
买方需对完成的设计评审、预验收、终验收等关键项目进度向买方提供及时的书面回复确认; 因买方单方面原因造成项目推进延误的时间,不计入交货周期。
5.When the buyer changes specification, the delay will not be calculated into delivery time.
买方过程中提出技术变更要求的时间不计入交货期
6.If the buyer delays the shipment or the acceptance and he is responsible for this, he  is charged for the additional costs that are occurred because of the delay.
如果买方推迟发货或延迟接收货物且属于买方责任的,买方应负担为推迟发货而发生的额外费用。
7.If the delay if caused by higher force, industrial action or actions that are outside of the influence of the supplier, the delivery time is to be extended adequately. The supplier has to inform the buyer as soon as possible about those circumstances.
如果发货因为不可抗力、罢工等供货方无法控制的原因推迟,交货时间应相应延期。供货方应及时将上述情况通知买方。

..............................