您现在的位置: 精品资料网 >> 行业分类 >> 建筑工程管理 >> 工程管理 >> 资料信息

土建合同中英文版(doc 72页)

所属分类:
工程管理
文件大小:
410 KB
下载地址:
相关资料:
中英文版
土建合同中英文版(doc 72页)内容简介
内容摘要
第一部分 协  议  书
Part One  The  Agreement
发包人(全称):新希望加尔各答动物饲料私人有限公司(以下简称甲方)
The Employer (full name) : New Hope Kolkata Animal Feed Private Limited (Hereinafter referred to as First Second  Party)
承包人(全称):印度朴实建筑发展私人有限公司(以下简称乙方)
The Contractor (full name): Pushy Construction and development India Pvt Ltd. (Hereinafter referred to as Second Party)
依照印度其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工事项协商一致,订立本合同。
In accordance with relevant laws, administrative rules and regulations in India, based on the principle of equality, voluntariness, fairness, honesty and credit, the two parties conclude the following Agreement on negotiated consensus of the construction items on this construction project.
一、 工程概况 The Project Overview
工程名称: 新希望加尔各答动物饲料私人有限公司年产26万吨饲料厂项目(土建工程)
Project Name: Annual output of 2,60,000 tons of feed processing projects for New Hope Kolkata Animal Feed Private Limited (civil works)
工程地点: 印度西孟加拉邦奈哈蒂政府工业园
The address of the project: Plot-A5, Rishi Bankim Shilpaudyan, PS-Naihati, North 24 Parganas, West Bengal, PIN-743165
工程立项批准或核准、备案文号: 西孟邦政府工厂局批复第23号(13/01/2016) 
Formality: No. 23 of year 2016, Directorate of Factories of West Bengal (13/01/2016)
资金来源:发包方企业自筹(已到位)
Capital source: Rasied by First Party (In place)
工程内容: 承包人按照施工图及甲乙双方的合同约定对主车间、成品车间、原料车间、雨棚一、锅炉房、卸料棚、发电机房、水泵房、综合楼、门卫、磅房、食堂、浴室、箱变、筒仓基础、地磅的土建、装饰、给排水、电气、消防、总平道路工程等图纸内容等分项工程。
Contents of the project: The Contractor undertake the following sectional works in accordance with the construction drawing and the agreement of the contract: the civil engineering and other engineering including decoration, water supply and drainage, electric, fire protection and the whole flat road for the main workshop, finished products warehouse, raw materials workshop, canopyⅠ, boiler room, unloading shed, generator room, water pump room, complex building, guard room, pound room, canteen, the bathroom, the box-type transformer, the silo foundation, the floor scale and so on , which are specified in the drawings.

..............................